- Summary
- The planning phase required coordinating the supply and erection of chimneys on the mast sections to ensure delivery to the site in full and on time, which was essential for integrating the system with crane hire services. These components needed to be delivered horizontally above the hotel entrance before rising vertically to reach the energy centre's roof, from where an additional extended horizontal run was required with support before turning into the main vertical runs supported by an existing concrete stack. This comprehensive approach ensured that the chimneys were properly aligned and positioned for safe installation at the site.
- Title
- Schiedel - Chimneys, stoves and ventilation solutions engineered for your life.
- Description
- Schiedel is the leader in energy efficient chimneys, integrated Stove & ventilation systems. Durable & highly developed with over 75 years of experience!
- Keywords
- chimneys, more, systems, read, products, system, project, installation, product, power, chimney, area, ventilation, garden, high, kingdom, stoves
- NS Lookup
- A 49.12.206.205
- Dates
-
Created 2026-03-07Updated 2026-04-15Summarized 2026-04-16
Query time: 3232 ms