- Summary
- Supporting the activities of Italgas Reti and Geoside, he intervened for the installation of a drinking water system capable of satisfying the water needs of Bardonetto, which received an area of 800 liters per sec, and for the installation of a storage tank in the Locana area. The work was carried out by Vignolo, responsible for the investments for the network, by Italgas Reti and by Fabio Tentori, in Odilia, for the realization of the investments for the network. The project involves the production of green hydrogen for the Sestu gas network, an advantageous technological solution for the production of energy without harmful emissions and for the well-being of the population.
- Title
- Homepage - Network Services
- Description
- Homepage - Network Services
- Keywords
- rete, news, rilievo, newsletter, tour, hotel, forte, sulla, location, smart, toscana, video
- NS Lookup
- A 138.201.222.226
- Dates
-
Created 2026-04-11Updated 2026-04-13Summarized 2026-04-15
Query time: 3808 ms